Viability of Standalone Battery Energy Storage Tariffs Discovered in 2025

Viability of Standalone Battery Energy Storage Tariffs Discovered in 2025

Date of release: May 2026

Report by JMK Research and IEEFA

India’s battery energy storage system (BESS) segment is entering a critical phase as the country’s clean energy transition becomes increasingly dependent on large-scale storage deployment. India’s cumulative tendered energy storage capacity has grown from 6.8 gigawatts (GW) in 2018 to 90.7GW by 2025. Standalone energy storage system (ESS) tenders, that contract storage capacity without being tied to a specific renewable generation asset, represented more than 71% of the total capacity tendered in 2025, with standalone BESS projects accounting for 60% of this.

Of the 10.4GW of standalone BESS actually allocated, the 2-hour, 2-cycle configuration with a 12-year contract tenor was the most prevalent, representing 57% of the total allocated capacity. The cost of storage, or tariffs, paid by procurers (distribution companies, power generation companies or central agencies like the Solar Energy Corporation of India Ltd [SECI]) to BESS developers declined sharply with the lowest discovered tariffs reaching INR1.48 lakh/megawatt/month (USD1,576/MW/month) for 2-hour systems, and INR2.85 lakh/MW/month (USD3,035/MW/month) for 4-hour systems.

Despite strong procurement momentum, the economic viability of the 2025 standalone BESS bids remains a key concern. Against a benchmark tariff of INR2.3 lakh/MW/month (USD2,449/MW/month) for the 2-hour, 2-cycle configuration, nearly 75% of allocated capacity in this segment falls within the risky category. In contrast, the 4-hour segment appears relatively more viable, with more than two-third of the allocated capacity aligned with the benchmark tariff. In the second half of 2025, tariff reduction accelerated with several large-scale tenders awarded at very low prices, suggesting speculative bidding behaviour.

2025 standalone BESS tenders — allocated tariffs vs viability benchmark

Execution risks further constrain project realisation. Between 2022 and 2025, tariffs declined by over 71%, far exceeding the 36% reduction in battery pack prices over the same period, indicating a growing divergence between tariffs and the underlying cost structures. During 2025, prices for lithium carbonate, a key input in lithium iron phosphate (LFP) cell manufacturing, in China increased sharply; and now the phased removal of export rebates from April 2026 is expected to further increase landed battery costs in India. Developer capability remains uneven, with only 46.3% of allocated capacity awarded to players with standalone BESS execution capabilities. The financing conditions also remain conservative as lenders typically expect internal rates of return (IRR) in the range of 15–20%.

Execution risks in standalone BESS are expected to have broader implications for the sector. Implementation delays in the range of nine to 18 months may persist due to challenges related to financial closure, procurement and commissioning. Cost pressures at lower tariffs could also lead to compromised asset quality, system reliability and safety. These challenges may ultimately constrain effective renewable energy integration in India’s energy mix.

Revisiting procurement frameworks will be critical to address emerging risks in the standalone BESS segment. This would include introducing cost-reflective tariff floors, tightening eligibility criteria, and revisiting the auction framework to ensure tariffs remain aligned with execution realities. Alongside this, a standardised payment security mechanism will be necessary to improve project bankability. In parallel, domestic manufacturing ecosystem and local supply chains will develop gradually. Introduction of the Approved List of Battery Manufacturers (ALBM), acceleration of cell manufacturing under the Production Linked Incentive (PLI) scheme, and the National Critical Mineral Mission (NCMM), will be essential to support this transition and reduce import dependence over time.

India’s BESS sector is transitioning from the tendering and pipeline stage to execution and on-ground project deployment. Near-term execution challenges could result in delays or cancellations for a portion of the allocated capacity. In the near term, supply chains will remain dependent on lithium carbonate imports from China, with a gradual diversification of sourcing and a shift towards a more diverse technology mix taking place. Ultimately, the pace and scale of energy storage deployment will determine India’s trajectory to achieve its 500GW renewable energy target by 2030.

Table of Contents

  • Key findings
  • Executive summary
  • Background
  • Standalone ESS auctions and tariffs in 2025
  • Standalone BESS tariff viability analysis
  • Execution risk evaluation
  • Impact on sectoral development
  • Future outlook
  • Conclusion

Enter the E-mail ID to download the report



    ABOUT US

    JMK Research & Analytics Private Limited is a leading research and consulting firm specializing in cleantech sectors across India and the Asia-Pacific region, including Renewable Energy, E-mobility, Energy Storage, and Green Hydrogen.

    With deep industry expertise and a strong network across the energy ecosystem, JMK delivers actionable insights, market intelligence, and strategic advisory services that enable organizations to design successful business strategies and capture emerging opportunities in the energy transition.

    CONTACT US

    JMK RESEARCH AND ANALYTICS PVT LTD.

    Address: 212A, Suncity Trade Tower, Sector 21, Gurugram, Haryana- 122016

    Phone: +91-7428306655

    Email: contact@jmkresearch.com

    Terms and Conditions

    Payment Policies

    FOLLOW US

    Subscribe Us